Funding was initially provided in fiscal year 1994 to accommodate replacement of the metal roof on the Thomas Jefferson Building. The existing roof has deteriorated due to acid rain and time factors. Temporary repairs were made to stop roof leaks which could cause considerable destruction of interior finishes presently being restored by the Jefferson Renovation and Restoration project. The estimated completion date is in fiscal year 1997. The award of a contract was scheduled for November 1995, with an estimated completion period of 24 months.

Estimate 1997

Library Buildings and Grounds,

Structural and Mechanical Care

Tenant Improvements to the Special Facilities Center

Funding was provided in fiscal year 1992 for repairs, cleaning and security of the Facility. The ground floor level was
assigned for child day care which also included playground facilities. The initial child care center work has been completed.
Hill Wide EMCS, JMMB

Funding was initially provided in fiscal year 1994 to replace the existing EMCS which employs 1970's technology and
therefore obsolete and no longer supported by any manufacturer. The system is necessary for operation, control and monitoring
of the Madison Building's environmental systems. This work is estimated to be complete in fiscal year 1997.

Replace Roof, TJB

Photoduplication Relocation, JAB

Funding was initially provided in fiscal year 1994 to improve refurbished space for the Photoduplication Division in the
John Adams Building. The scope of work included removal of asbestos containing materials, replacement of deteriorated floor
drains, ceiling systems, flooring, lighting and interior finishes. The estimated completion date for this work is August 1996.

Replace Electronic Book Conveyor System, Design

Funding was initially provided in fiscal year 1995 to contract for design services for the replacement of the computerized control system for the Library of Congress book conveyor system. The design will incorporate three existing systems into a single control system for the three major Buildings. The design consultant will be retained for purpose of oversight until completion of the replacement construction project, which has been funded and is scheduled to be completed in fiscal year 1998.

10.10

Funding was initially provided in fiscal year 1984 for renovating and resorting the Jefferson and Adams Buildings. The majority of this work is now complete. The Library is preparing layout plans for accomplishing the final office moves. Construct Book Storage Facility, Ft. Meade

Funding was initially provided in fiscal year 94 to address the Library's need for expanded collections storage space. After review of various alternative sites, Fort Meade was selected to construct a facility that will provide secure, high-tech storage and retrieval methods and environmentally acceptable space. The project is currently addressing the need for an Associate Architect to provide design and specifications necessary for a construction contract. The estimated completion date for this project is fiscal year 1999.

Funding for this project was initially provided in fiscal year 1996. The budget is based on design provided with funds appropriated in fiscal year 1995. The project will replace the existing computerized control equipment which uses 1970's technology, is obsolete and cannot be repaired as well as manual, mechanical systems dating to the 1930's. The replacement equipment will eliminate current concerns and further address and improve security of collections, quantity and speed of collections processing, dependability and ability to analyze system operations. The contract is scheduled to be completed in fiscal year 1998.

Estimate 1997

Library Buildings and Grounds,

Structural and Mechanical Care

Coolidge/Whittall Renovations

Funding was initially provided in fiscal year 1995 to upgrade the Coolidge Auditorium and Whittall Pavilion. The
project includes the employment of design consultants and award of construction contracts to upgrade interior finishes, theater
capabilities, which includes lighting, sound, seating, recording, movement of actors and music presentation. These facilities were
not included in the scope of work with the Renovation and Restoration project. The estimated completion date for this work
is in November 1997.

Renovation & Restoration, Jefferson and Adams Buildings

Replace Electronic Book Conveyor System, Jefferson Building

10.11

[blocks in formation]

39,000 с

13323ICIII

1995

$100,000

$99,284

$94,000

$94,000

1993

43,000

42,999

40,000

40,000

1991

20,000

16,044

20,000

20,000

1993

4,000

3,333

4,000

4,000

[blocks in formation]

APPROPRIATION: LIBRARY BUILDINGS AND GROUNDS

2501

GENERAL ANNUAL REPAIRS

$75,000

2502

ELEVATOR REPAIRS & IMPROVEMENTS

2504

MAINTENANCE, A/C SYSTEMS

160,000 с

2509

MISC IMPROVEMENTS

100,000

2560

EXTERIOR CAULKING & POINTING

60,000

2562

2563

CLEAN AIR DISTRIBUTION DUCT SYS, TJB /JAB
ASBESTOS ABATEMENT

100,000 с

2566

ROOF MAINTENANCE

2567

VAN, SPECIAL FACILITIES CENTER

2570

REPLACE SMOKE DETECTORS, JMMB

1993

234,000

275,634

159,000

159,000

1995

150,000

145,054

150,000

150,000

1995

150,000

64,303

140,000

140,000

1992

100,000

97,069

100,000

100,000

1991

142,000

161,687

142,000

142,000

2591

TRAINING

17,000 C

1995

34,000

25,156

80,000

80,000

499,000

3110

MATERIAL HANDLING & CLEANING EQUIP

32,300

3121

MOVABLE PARTITIONS

$2,000

3122

TOOLS, SPECIAL FACILITIES CENTER

3201

CARE OF GROUNDS

3202

SNOW REMOVAL

17,000

4,000

[blocks in formation]
[graphic]

PROJECTS

STRUCTURAL & MECHANICAL CARE, LIBRARY BUILDINGS AND GROUNDS

ARCHITECT OF THE CAPITOL

SUMMARY OF NO YEAR PROJECTS

YEAR

FIRST APPROP.

TOTAL
ESTIMATED
COST

APPROP.

FUNDING

REQUIRED

THRU FY 1996 TO COMPLETE

AMOUNT IN EXPENDED FY 97 BASE 10/1/95

OBLIGATED UNOBLIGATED UNLIQUIDATED 10/1/95 10/1/95 10/1/95

ESTIMATED

DATE OF

COMPLETION

0

304,135

307,955

254,045

3,820

1999

0

217,256

6,184,769

815,231

5,967,513

1997

[blocks in formation]

NO YEAR PROJECTS FUNDED IN THE BASE

FISCAL YEAR 1997

Elevator Modernization, JAB,TJB & JMMB
ADA Requirements

1993 •

1994 •

2,745,000
2,000,000

1,590,000

1,155,000

360,000

600,000

1,400,000

200,000

72,280
61,268

444,882
63,796

1,145,118

372,602

2000

$36,204

2,528

2003

NO YEAR PROJECTS FUNDED IN PRIOR FISCAL YEARS

Program for Energy Conservation LOC

1980 •

484,300

Tenant Improvements to St. Cecilia's

1992 ⚫

1,800,000

484,300
1,800,000

271,793
1,519,412

275,863

208,437

4,070

1998

1,361,624

238,376

42,212

1997

Connect/Repic Electro-Mechanical Control Sys

w/Hill-wide w/EMCS, JMMB

1994 ⚫

Roof Replace. Thomas Jefferson Bldg

1994

562,000
7,000,000

562,000

7,000,000

Photodupbcation Relocation, Adams Bldg

1994

54,707

54,707

Replace Elec Book Conveyor Sys Des

1995

100,000

100,000

C Auditorioum/W Pavillion Renovations

1995

2,500,000

2,500,000

Renov & Rest of Jeff & Adams Bldg

1984 T

$1,593,000

81,593,000

Construct A Book Storage Module At Ft. Meade
Replace Electronic Book Conveyor System

1994

3,186,000

3,186,000

1996

3,000,000

3,000,000

Unallotted balance

24,900

24,900

⚫ - Funding Thru FY 1996 provided over a multi-year period. T- Includes transfer of $593,000 from the Library of Congress

10.13

[blocks in formation]

Schedule A

CATEGORIES

1. Breakdown by Activity:

Library Buindings and Grounds,

Structural and Mechanical Care

Total

2. Breakdown by Object Class

11 Personnel Compensation
12 Personnel Benefits

13 Benefits to Former Personnel

21 Travel

22 Transportation of Things

23 Rent, Communications and Utilities

24 Printing and Reproduction

25 Other Services

26 Supplies and Materials

31 Equipment

32 Land and Structures

42 Insurance Claims and Indemnities

Total

• Includes Obligations from Prior Year "No Year" Authority.

[blocks in formation]
« ZurückWeiter »