Design Parking Garages, Lots 7 & 9

$10,000,000
This design project will develop documents to construct a parking
garage on lots 7 and 9. After construction, the garage will be used for
vehicles formerly housed in the RHOB. Impact if not funded. The new
parking garage will not be constructed and future parking demands will
not be met. FTE Impact: This project may require one FTE above the
existing FTE cap to serve as the Contracting Officer's Representative
(COR).

Design Renovation Upgrades, CHOB

$7,500,000

This design project will provide a comprehensive phased renovation
plan for the CHOB which was constructed in 1907. The infrastructure
will be modernized and all code compliancy issues will be addressed.
Impact if not funded: The CHOB will not be renovated using a
comprehensive approach which will contribute to the deterioration of
the existing structure and supporting infrastructure. FTE impact: This
project may require one FTE above the existing FTE cap to serve as the
Contracting Officer's Representative (COR).

Replace Windows, FHOB

$4,900,000

This project will replace 1,451 windows in the FHOB in two phases.
The windows in the FHOB are the building's original windows and
have deteriorated beyond functionality. The windows do not close once
opened, are architecturally unattractive, and loose heat in the winter and
allow for excessive solar heat gain in the summer. The work will
include lead paint abatement, removal and disposal of the old windows,
installation of energy efficient windows, and caulking and touch-up of
the interior walls. The new windows will be aluminum framed thermal
pane windows with window film for shatter protection. Impact if not
funded. The windows will continue to deteriorate (dry-rot) with
significant increases in heating and cooling expenses. FTE Impact.
This project may require up to three FTEs above the existing FTE cap.
Emergency Lighting, RHOB

$4,700,000

This project will provide emergency lighting systems throughout the
RHOB and meet current Building Officials & Code Administrators

(BOCA) and National Fire Protection Association (NFPA) life safety codes. In the event that utility power to the RHOB fails, many of the exit signs throughout the RHOB that identify points of egress will not have an emergency power source. Additionally, many utility rooms, machine rooms, egress routes, and adjacent tunnels throughout the complex lack emergency lighting. Impact if not funded: The building occupants will continue to be subjected to egress risks during a building emergency. FTE Impact. This project may require up to three FTEs above the existing FTE cap.

Exterior Waterproofing, HUGS

$4,500,000

This project will provide for a watertight seal to the House
Underground Garages (HUGs). A condition assessment completed in
1999 indicated that water is entering the building through joints and
openings and is causing the garage structure to deteriorate, to include
corrosion of the exit stairways and increased leaking through the roof-
top garden. Temporary supports have been added to keep portions of
the structure from collapsing. The maintenance work to the exterior of
the HUGS will include: installation of improved drainage, roof top
waterproofing repairs, and cleaning, pointing, and caulking the exterior
stone masonry. Impact if not funded: The structure will eventually
close due to deterioration, thereby eliminating 1,320 parking spaces.
FTE Impact. This project may require up to three FTEs above the
existing FTE cap.

[graphic]
[graphic]

Extend Sprinkler Systems, HOB

$3,300,000

This project will provide full sprinkler system coverage to all of the
areas in the House Office Buildings that lack the National Fire Safety
Code (NFSC) required sprinkler system coverage. The areas that will be
covered are: the hallways, corridors, and private offices and members'
suites of the CHOB, LHOB, FHOB, and more architecturally sensitive
areas such as the committee rooms, caucus rooms, and the grand
staircase and rotunda areas in the CHOB and LHOB. These areas were
identified in a study performed by Gage-Babcock & Associates in July
2000. Impact if not funded: The buildings will not meet fire and safety
codes and will not be fully protected in the event of fire. FTE Impact:
This project may require two FTEs above the existing FTE cap.

[graphic]

HOB-8 of 10

[graphic]
[graphic]
[graphic]

HOB Perimeter Security

$3,000,000 This project will install bollards, hydraulic barriers, and shelters from C Street and Washington Avenue SW, along D Street toward First Street SE, and to the intersection of First Street and C Street SE. Decorative bollards will be installed around Lot 4 and the O'Neill parking lot. Impact if not funded: The House Office Buildings perimeter security will not be completed and security will be compromised, potentially placing members, staff, and visitors at risk. FTE Impact: This project may require one FTE above the existing FTE cap to serve as the Contracting Officer's Representative (COR).

Emergency Lighting, LHOB

$2,700,000

This project will ensure that emergency lighting systems throughout the
LHOB and adjacent structures meet current Building Officials & Code
Administrators (BOCA) and National Fire Protection Association
(NFPA) life safety codes. In the event that utility power to the LHOB
fails, many of the exit signs throughout the LHOB that identify points
of egress will not have an emergency power source. Additionally,
many utility rooms, machine rooms, egress routes, and adjacent tunnels
throughout the complex lack emergency lighting. Impact if not funded:
The building occupants will continue to be subjected to egress risks
during a building emergency. FTE Impact: This project may require
two FTEs above the existing FTE cap to serve as the Contracting
Officer's Representative (COR).

Replacement of Escalator Bank, RHOB

$2,000,000

This project will modernize four escalators in the RHOB (Escalator Bank Two) to ensure that they are fully equipped with current safety features required by the safety code. Additionally, the escalators are 40 years old and are in poor condition. Each escalator will be removed sequentially to minimize interruptions. Impact if not funded. Service interruptions will continue with non-compliance to the American Society of Mechanical Engineers (ASME) safety standards. FTE Impact: This project may require one FTE above the existing FTE cap.

Design, Audibility & Intelligibility Fire Alarm Upgrade

$1,700,000

This design project will modernize and expand coverage of the existing fire alarm annunciation system to comply with the current audibility and intelligibility code requirements. Impact if not funded: The construction to upgrade the fire alarm annunciation system will not be performed, placing members, staff, and visitors at risk in the event of an emergency. FTE Impact: This project may require one FTE above the existing FTE cap to serve as the Contracting Officer's Representative (COR).

Existing Fire Alarm System Upgrade Study & Design

$1,250,000

This study and design will first survey the existing fire alarm systems in the FHOB, LHOB, RHOB, and the East and West House underground garages, and then develop a design plan to modernize all of the fire alarm systems to current technological standards. Impact if not funded. The fire alarm systems will not be upgraded, potentially placing members, staff, and visitors at risk in the event of an emergency. FTE Impact: This project may require one FTE above the existing FTE cap to serve as the Contracting Officer's Representative (COR).

Fire Alarm System Upgrade, HOB (Less RHOB)

$1,100,000

This project will upgrade the existing fire alarm systems of the CHOB,
LHOB, and FHOB. Many areas within the CHOB, LHOB, and FHOB
lack fire protection or have inadequate fire alarm protection which does
not meet the NFPA 72 Code requirement. Impact if not funded: The
CHOB, LHOB, and FHOB will not meet code requirements, potentially
placing members, staff, and visitors at risk in the event of an
emergency. FTE Impact: This project may require up to 13 FTEs
above the existing FTE cap.

[graphic]
[graphic]
[graphic]
[graphic]

Minor Construction

$5,000,000

This project provides flexibility for unforeseen needs including minor construction, repair, and major alteration projects, and related activities in connection with construction and maintenance activities of the House Office Buildings. Impact if not funded: The ability to execute projects to meet unforeseen requirements in a timely manner will be adversely This project m affected. FTE Impact: This project may require up to 40 FTEs above the existing FTE cap.

HOB-9 of 10

[graphic]
[graphic]
[graphic]
[graphic][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed]

*FY 2003 Actual represents total obligations of funds incurred in FY 2003, irrespective of the year of appropriation

HOB-10 of 10

ARCHITECT OF THE CAPITOL

Capitol Power Plant

[blocks in formation]

The Capitol Power Plant (CPP) is the Capitol Complex's centralized provider of utility services not available from other sources. The CPP also houses several functions related to the Legislative Branch Telecommunications Network and also provides dedicated space for satellite communication dishes. The CPP operates and maintains a central steam plant that provides steam for heating, and a central refrigeration plant that provides chilled water for air conditioning, and all the tunnel distribution and metering systems associated with delivering these utilities. Steam and chilled water are provided for several Legislative Branch clients within the Capitol Complex, to include the U. S. Capitol Building, Senate Office Buildings, Senate garage, House Office Buildings, House garages, Library of Congress Buildings, and the U. S. Botanic Garden. The CPP also provides steam and chilled water on a reimbursable basis to other clients, some of whom are not Legislative Branch entities.

FY 2005 CAPITOL POWER PLANT BUDGET

The FY 2005 CPP Budget consists of an annual budget and a multi-year budget which are summarized in the following table:

[blocks in formation]

Significant changes include the increases in Utilities ($6,274,000); Payroll
($2,388,000); Facilities Maintenance ($1,365,000); and the addition of the
Minor Construction line item ($1,000,000). The overall multi-year budget
decrease ($32,446,000) is due in most part to no additional funding for the
West Refrigeration Plant Expansion Project.

FULL-TIME EQUIVALENT REQUIREMENTS

The FY 2005 FTE requirement contained in the below table reflects an increase of 23 FTEs over the FY 2004 level of 94. This increase includes the realignment of 20 FTEs (all supporting high voltage and energy functions) from the General Administration appropriation to the CPP appropriation, the realignment of two FTEs currently supporting the Electronics Engineering Division from the General Administration appropriation, and one new FTE to support CPP operations.

[graphic]
[blocks in formation]

The FY 2005 CPP annual budget request is $59,386,000 which represents a 33.1% increase over the FY 2004 budget of $44,626,000. The annual budget consists of "Annual Recurring" and "Annual Nonrecurring" costs. Annual Recurring costs are broken down into Program Groups (as defined in the AOC General Statement) and Annual Nonrecurring costs are broken down into discrete activities. Justifications for the proposed 33.1% increase in the recurring and non-recurring FY 2005 CPP Annual Budget are provided in the section titled, "Analysis of Change."

[graphic]

MULTI-YEAR BUDGET

The FY 2005 CPP multi-year budget request is $3,990,000, which
represents a decrease of $32,446,000 from the FY 2004 budget of
$36,436,000. Where appropriate, 100% design documentation has been
received for projects prior to requesting construction funding. Project
descriptions and justifications for FY 2005 multi-year projects can be
found in the section titled, "Analysis of Change."

CPP- 1 of 10

[graphic]
[graphic]

CAPITOL POWER PLANT DETAILED FY 2005 BUDGET (3)

CPP-2 of 10